Hitachi International Distribution Center Addition

This Hitachi expansion added 200,000 square feet of warehouse with 20 dock bays and office space to the existing manufacturing facility to consolidate operations, more than doubling the facility’s space. The addition features a 33-foot clear height to accommodate high bay racking. Due to the storage of sensitive electronic equipment, insulated tilt-up concrete wall panels were used to create a temperature and humidity controlled atmosphere. The exterior envelope of insulated tilt-up panels satisfied the structural requirements for cladding and overall building stability. The use of incorporated panel treatments solved the aesthetic issue of matching the existing facility appearance, which was brick masonry. Deep foundations for building structural support were required due to expansive clays discovered during the geotechnical investigation. Stabilization procedures and soil remediation techniques were utilized in order to allow a slab on grade to be installed to support the operational requirements of the high bay warehouse. The facility is LEED certified and has parking for hybrid cars as well as bike racks.

Client
The Korte Company
Location
Norman, OK

More Projects

Caesar Creek Vineyards – Lake and Dam Repairs

Caesar Creek Vineyards – Lake and Dam Repairs

The tranquil setting of this winery property was marred when the…
Amazon Fulfillment Center

Amazon Fulfillment Center

The project consisted of the construction of a four-story sortation facility…
One Town Center

One Town Center

LJB provided structural engineering and tilt-up panel detailing on this project…