Mando

  •  

This new state-of-the-art casting facility allowed a global automotive parts supplier based in Seoul, South Korea to manufacture energy-efficient parts and systems. The facility measures 589,000 square feet, which includes an expansive distribution center, large machining floor, office space, clean rooms, 20 dock positions and 12 trailer positions.

The building was constructed with a combination of tilt-up concrete wall panels and insulated metal panels and features a clear height of 28 feet.

Client
ARCO Design/Build
Location
Meriweather County, GA

Related Projects

Bridgeway Station Block A

Bridgeway Station Block A

Bridgeway Station Block A is a mixed-use building that features 37,000…
SatPon Veteran's Memorial

SatPon Veteran's Memorial

LJB provided structural engineering services for this new 184,000-square-foot, single-story, front-loaded…
Port 10 Logistics Center

Port 10 Logistics Center

As part of an industrial park planned for eight buildings ranging…