Medline (Wilmer, TX)

For Medline’s new distribution center in Wilmer, Texas, LJB served as the structural engineer of record for the 800,000-square-foot cross-dock warehouse, which was constructed of a structural steel frame with concrete tilt-up wall panels. The facility includes a 20,000-square-foot cool room and was designed to accommodate automated control pick towers and conveyor belt systems.

Client
Evans General Contractors & Ware Malcomb
Location
Wilmer, Texas

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…