Monsanto Texas Cotton Breeding and Technology Center

This project included two buildings, one 30,000 square feet, the other 20,000 square feet. The project included the best attributes of tilt-up construction and pre-engineered metal building construction to provide this facility with low life-cycle maintenance costs.

The tilt-up wall panels on the perimeter support clear-spanning metal building girders, creating a completely column-free interior. The roof construction concludes horizontal x-bracing to provide lateral stability and a standing seam metal roof to provide a 25-year warranty. Tilt-up construction was the ideal choice for this project due to speed of construction and column-free interiors to accommodate the large agriculture equipment.

Additionally, the combination of tilt-up with SSMR provides a 25-year warranty roof (typical of a pre-engineered metal building). The lab facility has a concrete floor slab, but the equipment storage facility does not have a concrete floor slab since it is being used to house combines and other large farming equipment.

Client
Archi+Etc, LLC
Location
Lubbock, TX

More Projects

Northwest Logistics Center

Northwest Logistics Center

Located in an industrial park consisting of small metal building manufacturing…
5801 University Research Center

5801 University Research Center

This three-story, 75,000-square-foot commercial office building is located within a mixed-use…
EPL Airport Commerce Park Development

EPL Airport Commerce Park Development

This two-story, 134,500-square-foot comprehensive archive/biorepository services storage facility in Leesburg, Virginia,…