Montreal Airport Station, Transit Terminal for REM

  •  
  • Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections and Complex Fault Crossings
  • Client: Aeroports de Montreal
  • Construction Cost: $600 Million
  • Technology: Drill and Blast
  • Geology: Rock
  • Length: 815 ft (250 m)
  • Diameter: 31 ft (9.6 m) with 79 ft (24 m) span cavern
  • Depth: 86-142 ft (26-43 m)

Project Elements:

    • Design of cavern under terminal building
    • Access tunnel design
    • Track bifurcation caverns design
    • Cost estimating
    • Risk management and risk workshops
    • Quantitative risk analysis of budget and schedule
Client
Aeroports de Montreal
Location
Montreal, QB
Empire West Building 10

Empire West Building 10

LJB provided structural engineering for Empire West Building 10, a 640,000-square-foot,…
Stateview Boulevard, Buildings 1-3

Stateview Boulevard, Buildings 1-3

LJB provided structural engineering for a three-building speculative warehouse development. The…
Westside Logistics

Westside Logistics

LJB provided structural engineering for this speculative warehouse that offers more…