Montreal Airport Station, Transit Terminal for REM

  •  
  • Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections and Complex Fault Crossings
  • Client: Aeroports de Montreal
  • Construction Cost: $600 Million
  • Technology: Drill and Blast
  • Geology: Rock
  • Length: 815 ft (250 m)
  • Diameter: 31 ft (9.6 m) with 79 ft (24 m) span cavern
  • Depth: 86-142 ft (26-43 m)

Project Elements:

    • Design of cavern under terminal building
    • Access tunnel design
    • Track bifurcation caverns design
    • Cost estimating
    • Risk management and risk workshops
    • Quantitative risk analysis of budget and schedule
Client
Aeroports de Montreal
Location
Montreal, QB
Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…