Montreal Airport Station, Transit Terminal for REM

  •  
  • Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections and Complex Fault Crossings
  • Client: Aeroports de Montreal
  • Construction Cost: $600 Million
  • Technology: Drill and Blast
  • Geology: Rock
  • Length: 815 ft (250 m)
  • Diameter: 31 ft (9.6 m) with 79 ft (24 m) span cavern
  • Depth: 86-142 ft (26-43 m)

Project Elements:

    • Design of cavern under terminal building
    • Access tunnel design
    • Track bifurcation caverns design
    • Cost estimating
    • Risk management and risk workshops
    • Quantitative risk analysis of budget and schedule
Client
Aeroports de Montreal
Location
Montreal, QB
Morrison Bridge Rehabilitation

Morrison Bridge Rehabilitation

In 1874, the Morrison brothers built a cast-and-wrought-iron bowstring arch bridge…
Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…