Olathe Junior High #9

This 98,000-square-foot facility features a two-story academic wing and a lower level athletic wing that consists of two gymnasiums and a natatorium. The original concept for the building was traditional masonry, but an option for design-build tilt-up provided a cost savings that put the project $600,000 under budget and shaved two months off the schedule.

The exterior of the wall panels are a sampling of many different architectural finishes, including multiple types of cast-in brick, curtain wall windows and a hard trowel finish.

The building features insulated and non-insulated tilt-up concrete wall panels. One of the project’s greatest challenges was achieving an acceptable finish for the interior of the tilt-up panels in the athletic wing so additional finishing was not required on the inside.

Client
Summit Concrete
Location
Olathe, KS

Related Projects

BNSF Railway Bridge Hydraulic Analysis

BNSF Railway Bridge Hydraulic Analysis

For Burlington Northern Santa Fe (BNSF) Railway, LJB provided a site…
Norfolk Southern Culvert CD-279.76

Norfolk Southern Culvert CD-279.76

LJB provided Norfolk Southern Railway with a site survey, hydrologic and…
Frederick Airport Park – Phase I

Frederick Airport Park – Phase I

Frederick Airport Park Phase I added more than 515,000 square feet…