Premier Flex Warehouse I and II

When InterChange, a warehousing, logistics and development company, needed a new warehouse time was of the essence. The owner’s schedule called for only five months to complete the shell construction, with an additional three months for interior fit-out. The veteran design-build team leveraged the unmatched speed of tilt-up construction and constructed the new 64,000-square-foot Interchange Premier Flex II on a very tight schedule.

In addition to a tight schedule, the owner wanted the new warehouse to match the aesthetics of the adjacent buildings. With a dimple formliner and two-tone textured paint finish, the facility fits seamlessly into the industrial park.

Client
Nielsen Builders, Inc.
Location
Harrisonburg, VA

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…