Rebecca Trunk Wastewater Main

  •  
  • Role: Microtunnel Designer & Construction Inspection/Administration
  • Client: Cole Engineering
  • Construction Cost: $43 Million
  • Technology: Drill and Blast
  • Geology: Rock
  • Diameter: 1,200mm (48 in) & 1,350mm (54 in)
  • Length: 12,476 m & 1,575 m
  • Depth: 14 m (46 ft)

Project Elements:

  • Fourteen (14) microtunneling drives
  • Twelve (12) composite curved drives
  • Long microtunneling drives from 180m to 626m
  • Concrete caisson shafts
  • Shallow crossing of environmentally sensitive creek
Client
Cole Engineering
Location
Oakville, ON
Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…