Rebecca Trunk Wastewater Main

  •  
  • Role: Microtunnel Designer & Construction Inspection/Administration
  • Client: Cole Engineering
  • Construction Cost: $43 Million
  • Technology: Drill and Blast
  • Geology: Rock
  • Diameter: 1,200mm (48 in) & 1,350mm (54 in)
  • Length: 12,476 m & 1,575 m
  • Depth: 14 m (46 ft)

Project Elements:

  • Fourteen (14) microtunneling drives
  • Twelve (12) composite curved drives
  • Long microtunneling drives from 180m to 626m
  • Concrete caisson shafts
  • Shallow crossing of environmentally sensitive creek
Client
Cole Engineering
Location
Oakville, ON
BNSF Railway Bridge Hydraulic Analysis

BNSF Railway Bridge Hydraulic Analysis

For Burlington Northern Santa Fe (BNSF) Railway, LJB provided a site…
Norfolk Southern Culvert CD-279.76

Norfolk Southern Culvert CD-279.76

LJB provided Norfolk Southern Railway with a site survey, hydrologic and…
Frederick Airport Park – Phase I

Frederick Airport Park – Phase I

Frederick Airport Park Phase I added more than 515,000 square feet…