Redstone Manassas, Buildings A & B

LJB provided the structural design and drafting with shop drawings for two single-story, rear-loaded, speculative warehouses. Building A is 130,500-square-feet with a taper. Building B is 139,000-square-feet with a notched corner. Each building has a 32-foot minimum clear height requirement and multiple tenant entrances on the front elevations, with dock doors and drive-in doors along the rear elevations.

Client
Matan Companies
Location
Manassas, VA

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…