Rombach Avenue Improvements

  •    •    •  

This project implemented critical safety countermeasures and repaved a 2.19-mile section of Rombach Avenue (US 22), including a one-way street section (eastbound) on a horizontal curve that ties into two-way section.

LJB also designed the reconstruction of seven traffic signals, removal of three unwarranted signals, the incorporation of two ramp signals, and the coordination of nine signals through the corridor into a cohesive signal system. The system used spread spectrum radio communications, siren-based emergency vehicle preemption, radar detection, and painted mast arm signal supports.

The area includes dense commercial, industrial and general office land uses, as well as neighborhood properties, which all required access control measures. LJB quickly mobilized the design team to complete the design in less than 10 months.

 

Client
City of Wilmington
Location
Wilmington, Ohio

Related Projects

BNSF Railway Bridge Hydraulic Analysis

BNSF Railway Bridge Hydraulic Analysis

For Burlington Northern Santa Fe (BNSF) Railway, LJB provided a site…
Norfolk Southern Culvert CD-279.76

Norfolk Southern Culvert CD-279.76

LJB provided Norfolk Southern Railway with a site survey, hydrologic and…
Frederick Airport Park – Phase I

Frederick Airport Park – Phase I

Frederick Airport Park Phase I added more than 515,000 square feet…