SatPon Veteran’s Memorial

LJB provided structural engineering services for this new 184,000-square-foot, single-story, front-loaded warehouse facility. Due to site constraints, the building is expected to be irregularly shaped, with reduced areas at the northeast corner of the facility. The building structure consists of load-bearing concrete tiltwall panels around the building perimeter and conventional structural steel on the interior.

Client
Powers Brown Architecture
Location
Houston, TX

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…