LJB provided structural design for this new single-story, front loaded, speculative warehouse facility. The total building floor area to 196,560 square feet, including four one-story office appendages on the front elevation. Loading docks and drive-in ramps are provided along the front wall, along with storefronts at each office appendage.

Client
Ware Malcomb
Location
Houston, TX

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…