Westside Purple Line Extension, Phase 3: Rail Transit Line

  •  
  • Role: Tunnel Design Lead; Design Build for Contractor
  • Client: STV Inc.
  • Construction Cost: $1.27 Billion
  • Technology: EPBM
  • Geology:  Soft Ground
  • Dimensions: 20.3 ft ID (6.1 m)
  • Length: 2.6 mi (4.2 km)
  • Depth: 50-70 ft (15-21 m)
Project Elements:

  • Twin-bore tunnel in dense urban environment
  • Santa Monica fault – 700 ft wide at 63⁰
  • Undercrossing critical highway and water supply infrastructure
  • Undercrossing Westfield Shopping Mall
  • Multiple segmental lining designs, including regular, fault crossing special, cross passage special
  • Break-in and out of stations
  • Seismic connection between station and tunnel
Client
STV Inc.
Location
Westwood (Los Angeles), CA

Related Projects

Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…