Westside Purple Line Extension, Phase 3: Rail Transit Line

  •  
  • Role: Tunnel Design Lead; Design Build for Contractor
  • Client: STV Inc.
  • Construction Cost: $1.27 Billion
  • Technology: EPBM
  • Geology:  Soft Ground
  • Dimensions: 20.3 ft ID (6.1 m)
  • Length: 2.6 mi (4.2 km)
  • Depth: 50-70 ft (15-21 m)
Project Elements:

  • Twin-bore tunnel in dense urban environment
  • Santa Monica fault – 700 ft wide at 63⁰
  • Undercrossing critical highway and water supply infrastructure
  • Undercrossing Westfield Shopping Mall
  • Multiple segmental lining designs, including regular, fault crossing special, cross passage special
  • Break-in and out of stations
  • Seismic connection between station and tunnel
Client
STV Inc.
Location
Westwood (Los Angeles), CA

Related Projects

Empire West Building 10

Empire West Building 10

LJB provided structural engineering for Empire West Building 10, a 640,000-square-foot,…
Stateview Boulevard, Buildings 1-3

Stateview Boulevard, Buildings 1-3

LJB provided structural engineering for a three-building speculative warehouse development. The…
Westside Logistics

Westside Logistics

LJB provided structural engineering for this speculative warehouse that offers more…