Florida Gateway Logistics Park, Phase 1, Buildings 2, 3, & 8

LJB provided structural design for three single-story, cross-dock warehouses totaling more than 1.7M square feet. The facilities were constructed with conventional steel framing and load bearing tilt-up concrete panels.

Client
Evans General Contractors
Location
Jacksonville, FL

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…