Crenshaw/LAX Transit Corridor

  •  
  • Role: SOE Design of Stations; Design Build for Contractor
  • Client: Walsh-Shea Constructors
  • Construction Cost: $1.27 Billion
  • Technology: Cut and Cover
  • Geology:  Soft Ground; Young and Old Alluvium
  • Dimensions: 3 stations, each 806 x 110 ft (245 x 33 m) – 70 ft (21 m) diameter
  • Length: 13,728 ft (4 km)
  • Depth: 67-71 ft (20-21 m)

Project Elements:

  • Basis of design, means and methods – design criteria
  • Development of work sequences
  • Detailed design of SOE for station boxes
  • Design of entryways and access hatches
  • Design of utility supports and straps
  • Headwalls and break-in and out design for TBM excavation
Client
Walsh-Shea Constructors
Location
Los Angeles, CA
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel