- Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build
- Client: Ricondo
- Construction Cost: $140 Million
- Technology: CSEM, Drill and Blast
- Geology: Soil/Rock
- Dimensions: 22 ft (6.7 m); Tunnel bifurcation up to 48 ft (14.5 m) span
- Length: 1780 ft (237 m)
- Depth: 36-55 ft (11-17 m)
Project Elements:
- (x1) Access Shaft – 36 ft ID x 56 ft deep
- Tunnel connecting main terminal and intercontinental hotel
- Geotecnical data review
- 30% design drawings
- Preparation for bidding
- Review and approval of Contractor’s design