Rebecca Trunk Wastewater Main

  •  
  • Role: Microtunnel Designer & Construction Inspection/Administration
  • Client: Cole Engineering
  • Construction Cost: $43 Million
  • Technology: Drill and Blast
  • Geology: Rock
  • Diameter: 1,200mm (48 in) & 1,350mm (54 in)
  • Length: 12,476 m & 1,575 m
  • Depth: 14 m (46 ft)

Project Elements:

  • Fourteen (14) microtunneling drives
  • Twelve (12) composite curved drives
  • Long microtunneling drives from 180m to 626m
  • Concrete caisson shafts
  • Shallow crossing of environmentally sensitive creek
Client
Cole Engineering
Location
Oakville, ON
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…
Crenshaw/LAX Transit Corridor

Crenshaw/LAX Transit Corridor

Role: SOE Design of Stations; Design Build for Contractor Client: Walsh-Shea Constructors…