Montreal Airport Station, Transit Terminal for REM

  •  
  • Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections and Complex Fault Crossings
  • Client: Aeroports de Montreal
  • Construction Cost: $600 Million
  • Technology: Drill and Blast
  • Geology: Rock
  • Length: 815 ft (250 m)
  • Diameter: 31 ft (9.6 m) with 79 ft (24 m) span cavern
  • Depth: 86-142 ft (26-43 m)

Project Elements:

    • Design of cavern under terminal building
    • Access tunnel design
    • Track bifurcation caverns design
    • Cost estimating
    • Risk management and risk workshops
    • Quantitative risk analysis of budget and schedule
Client
Aeroports de Montreal
Location
Montreal, QB
Okanagan Specialty Fruits Company Controlled Atmosphere Warehouse

Okanagan Specialty Fruits Company Controlled Atmosphere Warehouse

This 110,000-square-foot cold storage facility was designed and constructed with precision…
Pipeline Relocation along IH 820

Pipeline Relocation along IH 820

Our team performed engineering and surveying services for the relocation of…
Grapeview Station Facility Expansion

Grapeview Station Facility Expansion

Prior to joining LJB Engineering, Grantham & Associates provided site civil…