Bass Lake Channel Repair

  •  

In 2016, Bass Lake overtopped the emergency spillway during the flooding caused by Hurricane Matthew. LJB provided a dam inspection and technical report of the observations and recommendations. While the dam components remained structurally sound after the flood event, the downstream channel had experienced significant damage. We assisted the Town in providing conceptual design and estimated construction cost information to FEMA, and the Town received funding to complete the channel improvements project.

This project includes a gabion wall to stabilize a portion of the streambank, a gabion structure to provide spillway protection, and a boulder/step pool sequence that traverses flood flows through the steep reach in a more controlled manner. It also includes construction of a trail base for the recreation trail that was damaged in the flood. LJB is also providing construction management services for the project.

Client
Town of Holly Springs
Location
Holly Springs, NC

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…