This new state-of-the-art casting facility allowed a global automotive parts supplier based in Seoul, South Korea to manufacture energy-efficient parts and systems. The facility measures 589,000 square feet, which includes an expansive distribution center, large machining floor, office space, clean rooms, 20 dock positions and 12 trailer positions.

The building was constructed with a combination of tilt-up concrete wall panels and insulated metal panels and features a clear height of 28 feet.

Client
ARCO Design/Build
Location
Meriweather County, GA

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…