Metro Storage

This new 53,600-square-foot, three-story storage facility features more than 550 individual units. Features of the location include 100% climate-controlled storage, drive-up access units, large interior drive-in loading/unloading bays with additional access points around the building, elevator access and a large, modern retail office. The project was completed in less than 8 months, bringing much needed new options for this community.

This project also helped showcase the tilt-up construction method through a series of videos, which can be viewed here.

Client
Bedrock Concrete Corporation
Location
Wall Township, NJ

Related Projects

BNSF Railway Bridge Hydraulic Analysis

BNSF Railway Bridge Hydraulic Analysis

For Burlington Northern Santa Fe (BNSF) Railway, LJB provided a site…
Norfolk Southern Culvert CD-279.76

Norfolk Southern Culvert CD-279.76

LJB provided Norfolk Southern Railway with a site survey, hydrologic and…
Frederick Airport Park – Phase I

Frederick Airport Park – Phase I

Frederick Airport Park Phase I added more than 515,000 square feet…