Metro Storage

This new 53,600-square-foot, three-story storage facility features more than 550 individual units. Features of the location include 100% climate-controlled storage, drive-up access units, large interior drive-in loading/unloading bays with additional access points around the building, elevator access and a large, modern retail office. The project was completed in less than 8 months, bringing much needed new options for this community.

This project also helped showcase the tilt-up construction method through a series of videos, which can be viewed here.

Client
Bedrock Concrete Corporation
Location
Wall Township, NJ

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…