Rebecca Trunk Wastewater Main

  •  
  • Role: Microtunnel Designer & Construction Inspection/Administration
  • Client: Cole Engineering
  • Construction Cost: $43 Million
  • Technology: Drill and Blast
  • Geology: Rock
  • Diameter: 1,200mm (48 in) & 1,350mm (54 in)
  • Length: 12,476 m & 1,575 m
  • Depth: 14 m (46 ft)

Project Elements:

  • Fourteen (14) microtunneling drives
  • Twelve (12) composite curved drives
  • Long microtunneling drives from 180m to 626m
  • Concrete caisson shafts
  • Shallow crossing of environmentally sensitive creek
Client
Cole Engineering
Location
Oakville, ON
VA Community-Based Outpatient Clinic

VA Community-Based Outpatient Clinic

Our structural and civil teams collaborated on the design of a…
Mercy Hospital (Northern Light Health)

Mercy Hospital (Northern Light Health)

Since 2001, Gorrill Palmer (and LJB Engineering Company) has been a…
Kings Island Drive Roadway & Safety Improvements

Kings Island Drive Roadway & Safety Improvements

To support increasing traffic demands, as well as the development of…