Rogers Branch Road/Forestville Road Improvements

  •  

In preparation for a new commercial development on the northeast corner of Rogers Branch and Forestville Roads in Wake Forest, NC, LJB provided a traffic impact study and subsequent transportation engineering services to implement improvements.

LJB designed roadway widening as needed. We also realigned the sidewalk and tied it back into the existing sidewalk on the north and south ends of the section. Our team also modified the traffic signal at the Forestville Road at Rogers Branch Road intersection to allow for the new lane and realigned Rogers Branch Road. LJB also analyzed the existing drainage system to determine its ability to accommodate the additional runoff from the proposed development and the roadway improvements.

Client
Sassom LLC
Location
Wake Forest, NC

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…