Verizon Orlando

This 221,000-square-foot, four-story office building was constructed with concrete tilt-up wall panels, including interior walls to build stairs and elevator cores. LJB provided structural design concurrently with the steel detailing package. Streamlining these services saved 10% in cost and a month in the schedule. The facility features a painted exterior with panel returns for added architectural appeal. The building was also designed to be LEED Certifiable.

Client
Skanska USA Building Inc.
Location
Lake Mary, FL

Related Projects

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…