Camp Hall, Campus 4, Buildings A, B & C

LJB provided structural design for three facilities totaling 934,380 square feet located within Camp Hall’s 77-acre Campus 4A site. The three facilities are constructed of tilt-up concrete wall panels with structural steel frames and were designed for the seismic requirements of Charleston, SC. Buildings A and B span approximately 220,000 square feet each with a rear-loading layout, 32-foot clear heights, 36 dock doors and two drive-in doors. Building C spans approximately 500,000 square feet and feature a cross-dock layout, 36-foot clear heights, 116 dock doors and four drive-in doors.

Client
Frampton Construction
Location
Ridgeville, SC

Related Projects

Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…