Atlanta Airport Plane Train Turnback Tunnel

  •  
  • Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build
  • Client: Ricondo
  • Construction Cost: $140 Million
  • Technology: CSEM, Drill and Blast
  • Geology:  Soil/Rock
  • Dimensions: 22 ft (6.7 m); Tunnel bifurcation up to 48 ft (14.5 m) span
  • Length: 1780 ft (237 m)
  • Depth: 36-55 ft (11-17 m)

Project Elements:

  • (x1) Access Shaft – 36 ft ID x 56 ft deep
  • Tunnel connecting main terminal and intercontinental hotel
  • Geotecnical data review
  • 30% design drawings
  • Preparation for bidding
  • Review and approval of Contractor’s design
Client
Ricondo
Location
Atlanta, GA
VA Community-Based Outpatient Clinic

VA Community-Based Outpatient Clinic

Our structural and civil teams collaborated on the design of a…
Mercy Hospital (Northern Light Health)

Mercy Hospital (Northern Light Health)

Since 2001, Gorrill Palmer (and LJB Engineering Company) has been a…
Kings Island Drive Roadway & Safety Improvements

Kings Island Drive Roadway & Safety Improvements

To support increasing traffic demands, as well as the development of…