Montreal Airport Station, Transit Terminal for REM

  •  
  • Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections and Complex Fault Crossings
  • Client: Aeroports de Montreal
  • Construction Cost: $600 Million
  • Technology: Drill and Blast
  • Geology: Rock
  • Length: 815 ft (250 m)
  • Diameter: 31 ft (9.6 m) with 79 ft (24 m) span cavern
  • Depth: 86-142 ft (26-43 m)

Project Elements:

    • Design of cavern under terminal building
    • Access tunnel design
    • Track bifurcation caverns design
    • Cost estimating
    • Risk management and risk workshops
    • Quantitative risk analysis of budget and schedule
Client
Aeroports de Montreal
Location
Montreal, QB
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…
Crenshaw/LAX Transit Corridor

Crenshaw/LAX Transit Corridor

Role: SOE Design of Stations; Design Build for Contractor Client: Walsh-Shea Constructors…